ITAC Assessment: MI0010
ITAC logo
ITAC Assessment: MI0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Bakery Products
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $1
M
to 5
M
# of Employees 12
Plant Area 28,000
ft2
Annual Production 0
units
Production Hrs. Annual 3,120
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,059 551,520
kWh
Electricity Demand $10,718 1,320
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,727 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,216

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Product Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $2,160 $1,009 - - - $2,160
02 3.4155: Meter waste water $3,711 $3,650 - - $3,711
-
Tgal
-
03 4.424: Improve space comfort conditioning $47,345 $7,000 $3,537
130,291
kWh
- - $43,808
04 2.7144: Install spectral reflectors / delamp $8,000 $5,000 $8,000
69,334
kWh
- - -
05 2.7232: Replace existing hvac unit with high efficiency model $7,511 $6,500 $6,204
117,062
kWh
$1,307
-
kW-mo/yr
- -
TOTAL RECOMMENDED $68,727 $23,159 $17,741
316,687
kWh
$1,307
-
kW-mo/yr
$3,711
-
Tgal
$45,968
TOTAL IMPLEMENTED $61,216 $16,659 $11,537
199,625
kWh
- $3,711
-
Tgal
$45,968
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs