| Assessment Year | 2026 |
|---|---|
| Principal Product | Ice Cream Mix |
| NAICS | 311520: Ice Cream and Frozen Dessert Manufacturing |
| SIC | 2024: Ice Cream and Frozen Desserts |
| Sales Range | $100 M to 500M |
| # of Employees | 100 |
| Plant Area |
32,405
ft2
|
| Annual Production | 14,000
Tgal
|
| Production Hrs. Annual | 5,200
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $122,822 | 1,622,732 |
kWh
|
$0.076 | |
| Electricity Demand | $65,931 | 5,777 |
kW-mo/yr
|
$11.41 | |
| Electricity Fees | $4,449 | - |
|
- | |
| Natural Gas | $22,960 | 4,491 |
MMBtu
|
$5.11 | |
| Waste Disposal Costs | |||||
| Water Usage | $123,598 | 6,185 |
Tgal
|
$19.98 | |
| TOTAL YEARLY COSTS | $339,760 | ||||
| RECOMMENDED SAVINGS* | $178,638 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3191: Use demand controller or load shedder | $13,290 | $8,730 |
$8,633
113,591
kWh
|
$4,657
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,193 | $360 |
$4,193
55,174
kWh
|
- | - | - | - | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,993 | - |
$1,993
26,227
kWh
|
- | - | - | - | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,691 | - |
$1,460
19,215
kWh
|
- | - | - | $110 | $121 | |
| 05 | 2.2121: Increase amount of condensate returned | $1,007 | $1,670 | - | - |
$1,007
-
MMBtu
|
- | - | - | |
| 06 | 2.1116: Improve combustion control capability | $868 | $1,400 | - | - |
$868
-
MMBtu
|
- | - | - | |
| 07 | 2.1222: Install turbulators | $747 | $3,000 | - | - |
$747
-
MMBtu
|
- | - | - | |
| 08 | 3.4116: Meter recycled water (to reduce sewer charges) | $40,788 | $5,352 | - | - | - |
$40,788
-
Tgal
|
- | - | |
| 09 | 3.4154: Eliminate leaks in water lines and valves | $6,235 | $2,204 | - | - | - |
$6,235
-
Tgal
|
- | - | |
| 10 | 4.113: Install refrigeration system to cool product | $76,474 | $55,000 |
$(-5,472.0)
(-72,000)
kWh
|
$(-2,054.0)
-
kW-mo/yr
|
- | - | - | $84,000 | |
| 11 | 4.424: Improve space comfort conditioning | $31,352 | $6,210 |
$(-476.0)
(-6,258)
kWh
|
$(-204.0)
-
kW-mo/yr
|
- | - | - | $32,032 | |
| TOTAL RECOMMENDED | $178,638 | $83,926 |
$10,331
135,949
kWh
|
$2,399
-
kW-mo/yr
|
$2,622
-
MMBtu
|
$47,023
-
Tgal
|
$110 | $116,153 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs