94
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SU0208 #07 Y:2004 | 07 | 2004 | Use adjustable frequency drive or multiple speed motors on existing system | $17,975 | $26,200 | |
| SU0208 #06 Y:2004 | 06 | 2004 | Use waste heat from hot flue gases to preheat | $137,714 | $144,177 | |
| SU0208 #05 Y:2004 | 05 | 2004 | Utilize higher efficiency lamps and/or ballasts | $2,067 | $1,456 | |
| SU0208 #04 Y:2004 | 04 | 2004 | Install compressor air intakes in coolest locations | $9,644 | $1,626 | |
| SU0208 #03 Y:2004 | 03 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,385 | $1,250 | |
| SU0208 #02 Y:2004 | 02 | 2004 | Use or replace with energy efficient substitutes | $71,711 | $7,200 | |
| SU0208 #01 Y:2004 | 01 | 2004 | Utilize energy-efficient belts and other improved mechanisms | $2,549 | - | |
| SU0206 #05 Y:2004 | 05 | 2004 | Utilize a less expensive cooling method | $102,975 | $200,000 | n/a |
| SU0206 #04 Y:2004 | 04 | 2004 | Use flue gases to heat process or service water | $255,262 | $207,240 | |
| SU0206 #03 Y:2004 | 03 | 2004 | Install compressor air intakes in coolest locations | $3,234 | $1,352 | |
| SU0206 #02 Y:2004 | 02 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,139 | $1,148 | |
| SU0206 #01 Y:2004 | 01 | 2004 | Reduce the pressure of compressed air to the minimum required | $5,971 | - | |
| SU0198 #06 Y:2004 | 06 | 2004 | Upgrade controls on compressors | $25,497 | $15,000 | |
| SU0198 #05 Y:2004 | 05 | 2004 | Utilize higher efficiency lamps and/or ballasts | $1,416 | $883 | |
| SU0198 #04 Y:2004 | 04 | 2004 | Install occupancy sensors | $925 | $401 | |
| SU0198 #03 Y:2004 | 03 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,691 | $736 | |
| SU0198 #02 Y:2004 | 02 | 2004 | Install compressor air intakes in coolest locations | $5,671 | $133 | |
| SU0198 #01 Y:2004 | 01 | 2004 | Change rate schedules or other changes in utility service | $7,681 | - | |
| SU0175 #08 Y:2003 | 08 | 2003 | Install solid waste incinerator for heat | $9,162 | $8,765 | |
| SU0175 #07 Y:2003 | 07 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $510 | $468 |