ITAC Assessment: SU0175
ITAC logo
ITAC Assessment: SU0175
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Processed Fruit
NAICS 311421: Fruit and Vegetable Canning
SIC 2030:
Sales Range $10
M
to 50
M
# of Employees 152
Plant Area 100,000
ft2
Annual Production 80,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $348,884 6,408,000
kWh
Electricity Demand $167,416 18,960
kW-mo/yr
LPG $232,611 22,859
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $133,176 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $124,014

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.7111: Reduce illumination to minimum necessary levels $839 - $565
11,315
kWh
$274
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $99,155 $3,104 $72,930
1,458,600
kWh
$26,225
-
kW-mo/yr
-
03 2.7261: Install timers and/or thermostats $3,889 $896 - - $3,889
-
MMBtu
04 3.4151: Minimize water usage $1,683 $427 $350
7,000
kWh
- $1,333
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,174 $6,679 $5,525
110,500
kWh
$2,649
-
kW-mo/yr
-
06 2.2442: Preheat combustion air with waste heat $9,764 $8,647 - - $9,764
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $510 $468 $375
7,514
kWh
$135
-
kW-mo/yr
-
08 3.6122: Install solid waste incinerator for heat $9,162 $8,765 - - $9,162
-
MMBtu
TOTAL RECOMMENDED $133,176 $28,986 $79,745
1,594,929
kWh
$29,283
-
kW-mo/yr
$24,148
-
MMBtu
TOTAL IMPLEMENTED $124,014 $20,221 $79,745
1,594,929
kWh
$29,283
-
kW-mo/yr
$14,986
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs