Assessment Year | 2006 |
---|---|
Principal Product | Steel Forgings |
NAICS | 331110: Iron and Steel Mills and Ferroalloy Manufacturing |
SIC | 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills |
Sales Range | $10 M to 50M |
# of Employees | 76 |
Plant Area |
88,000
ft2
|
Annual Production | 10,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $297,460 | 3,344,312 |
kWh
|
$0.089 |
Electricity Fees | $78,075 | - |
|
- |
Natural Gas | $2,057,365 | 224,193 |
MMBtu
|
$9.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $95,638 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $78,392 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $40,871 | $5,998 | - | - |
$40,871
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $37,521 | $5,040 |
$29,731
334,431
kWh
|
$7,790 | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $7,864 | $474 |
$6,231
70,093
kWh
|
$1,633 | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $5,081 | $60 |
$4,026
45,285
kWh
|
$1,055 | - | |
05 | 2.7224: Reduce space conditioning during non-working hours | $3,580 | $596 |
$2,837
31,908
kWh
|
$743 | - | |
06 | 2.7135: Install occupancy sensors | $427 | $60 |
$338
3,809
kWh
|
$89 | - | |
07 | 2.7134: Use photocell controls | $294 | $30 |
$233
2,621
kWh
|
$61 | - | |
TOTAL RECOMMENDED | $95,638 | $12,258 |
$43,396
488,147
kWh
|
$11,371 |
$40,871
-
MMBtu
|
||
TOTAL IMPLEMENTED | $78,392 | $11,038 |
$29,731
334,431
kWh
|
$7,790 |
$40,871
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs