62
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0578 #04 Y:1999 | 04 | 1999 | Use hot process fluids to preheat incoming process fluids | $17,671 | $3,000 | |
| UD0578 #03 Y:1999 | 03 | 1999 | Install equipment to move product | $19,500 | $8,600 | |
| UD0578 #02 Y:1999 | 02 | 1999 | Develop standard operating procedures | $26,052 | - | |
| UD0578 #01 Y:1999 | 01 | 1999 | Install shelves / racks to utilize unused space | $323,997 | $26,940 | |
| UD0519 #05 Y:1997 | 05 | 1997 | Install equipment to move product | $14,413 | $6,000 | |
| UD0519 #04 Y:1997 | 04 | 1997 | Use demand controller or load shedder | $811 | - | |
| UD0519 #03 Y:1997 | 03 | 1997 | Utilize higher efficiency lamps and/or ballasts | $453 | $888 | |
| UD0519 #02 Y:1997 | 02 | 1997 | Utilize higher efficiency lamps and/or ballasts | $557 | $1,915 | |
| UD0519 #01 Y:1997 | 01 | 1997 | Use gravity feeds wherever possible | $9,099 | $5,828 | |
| UD0450 #09 Y:1994 | 09 | 1994 | Utilize controls to operate equipment only when needed | $2,319 | - | |
| UD0450 #08 Y:1994 | 08 | 1994 | Maximize production runs to reduce cleaning | $24,424 | - | |
| UD0450 #07 Y:1994 | 07 | 1994 | Meter waste water | $61,699 | $2,000 | |
| UD0450 #06 Y:1994 | 06 | 1994 | Replace electrically-operated equipment with fossil fuel equipment | $1,370 | $2,500 | |
| UD0450 #05 Y:1994 | 05 | 1994 | Reduce illumination to minimum necessary levels | $980 | $250 | |
| UD0450 #04 Y:1994 | 04 | 1994 | Utilize higher efficiency lamps and/or ballasts | $5,449 | $10,000 | |
| UD0450 #03 Y:1994 | 03 | 1994 | Utilize controls to operate equipment only when needed | $6,103 | $2,000 | |
| UD0450 #02 Y:1994 | 02 | 1994 | Recover waste heat from equipment | $4,096 | $2,000 | |
| UD0450 #01 Y:1994 | 01 | 1994 | Turn off equipment during breaks, reduce operating time | $9,163 | - | |
| UD0127 #04 Y:1984 | 04 | 1984 | Use most efficient type of electric motors | $79 | $83 | |
| UD0127 #03 Y:1984 | 03 | 1984 | Use proper thickness of insulation on building envelope | $6,348 | $15,950 |