ITAC Assessment: UD0519
ITAC logo
ITAC Assessment: UD0519
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product jellies, sauces, vinaigrettes, & mustard
NAICS
n/a
SIC 2032: Canned Specialties
Sales Range n/a
# of Employees 45
Plant Area 35,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 3,300
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,852 360,199
kWh
Electricity Demand $1,520 108
kW-mo/yr
Electricity Fees $5,079 -
LPG $8,473 919
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,333 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,333

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.5124: Use gravity feeds wherever possible $9,099 $5,828 $195
7,327
kWh
$2,904
-
kW-mo/yr
$4,280 $1,720
02 2.7142: Utilize higher efficiency lamps and/or ballasts $557 $1,915 $192
7,034
kWh
$365
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $453 $888 $156
5,862
kWh
$297
-
kW-mo/yr
- -
04 2.3191: Use demand controller or load shedder $811 - - $304
-
kW-mo/yr
$507 -
05 4.445: Install equipment to move product $14,413 $6,000 $(-134.0)
(-4,982)
kWh
$(-253.0)
-
kW-mo/yr
- $14,800
TOTAL RECOMMENDED $25,333 $14,631 $409
15,241
kWh
$3,617
-
kW-mo/yr
$4,787 $16,520
TOTAL IMPLEMENTED $25,333 $14,631 $409
15,241
kWh
$3,617
-
kW-mo/yr
$4,787 $16,520
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs