ITAC Assessment: UD0578
ITAC logo
ITAC Assessment: UD0578
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product mustard and horseradish condiments
NAICS
n/a
SIC 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 70,000
ft2
Annual Production 480,000
pieces
Production Hrs. Annual 4,862
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,824 1,341,735
kWh
Natural Gas $41,825 8,807
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $411,362 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $366,410

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 4.515: Install shelves / racks to utilize unused space $323,997 $26,940 - - - - $65,520 $258,477
02 4.625: Develop standard operating procedures $26,052 - - - - - $5,850 $20,202
03 4.445: Install equipment to move product $19,500 $8,600 - - - - $19,500 -
04 2.2444: Use hot process fluids to preheat incoming process fluids $17,671 $3,000 - $8,147
-
MMBtu
$9,524
-
Tgal
- - -
05 2.3137: Use power during off-peak periods $8,867 - $8,867
71,219
kWh
- - - - -
06 3.4116: Meter recycled water (to reduce sewer charges) $5,242 - - - $5,242
-
Tgal
- - -
07 3.3122: Use filtration, centrifuging to remove contaminants $3,939 $6,750 - - $3,939
-
Tgal
- - -
08 2.4323: Use optimum size and capacity equipment $3,734 $13,000 $3,734
155,627
kWh
- - - - -
09 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,220 $230 $1,220
50,703
kWh
- - - - -
10 3.5315: Lease / purchase baler; sell cardboard to recycler $1,140 - - - - $2,700
-
lb
$(-1,560.0) -
TOTAL RECOMMENDED $411,362 $58,520 $13,821
277,549
kWh
$8,147
-
MMBtu
$18,705
-
Tgal
$2,700
-
lb
$89,310 $278,679
TOTAL IMPLEMENTED $366,410 $38,540 - $8,147
-
MMBtu
$14,766
-
Tgal
- $85,020 $258,477
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs