ITAC Assessment: AR0152
ITAC logo
ITAC Assessment: AR0152
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Office Furniture
NAICS
n/a
SIC 2521: Wood Office Furniture
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 125,530
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 3,128
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,215 2,546,014
kWh
Electricity Demand $48,904 7,245
kW-mo/yr
Natural Gas $91,056 22,203
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,014 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,715

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4221: Install compressor air intakes in coolest locations $613 $210 $338
10,551
kWh
$275
-
kW-mo/yr
- - - -
02 2.2511: Insulate bare equipment $492 $132 - - $492
-
MMBtu
- - -
03 2.4133: Use most efficient type of electric motors $288 $668 $151
4,689
kWh
$137
-
kW-mo/yr
- - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $755 - $396
12,309
kWh
$359
-
kW-mo/yr
- - - -
05 2.7111: Reduce illumination to minimum necessary levels $3,840 $240 $1,930
60,375
kWh
$1,910
-
kW-mo/yr
- - - -
06 3.8142: Distill contaminated solvents for reuse $9,519 $6,000 $(-148.0)
(-2,638)
kWh
- - $4,332
-
gal
- $5,335
07 4.111: Add equipment/ operators to reduce production bottleneck $7,507 $125 - - - - $7,507 -
TOTAL RECOMMENDED $23,014 $7,375 $2,667
85,286
kWh
$2,681
-
kW-mo/yr
$492
-
MMBtu
$4,332
-
gal
$7,507 $5,335
TOTAL IMPLEMENTED $12,715 $575 $2,664
83,235
kWh
$2,544
-
kW-mo/yr
- - $7,507 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs