ITAC Assessment: MA0128
ITAC logo
ITAC Assessment: MA0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product TEFLON HOSE & COUPLINGS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 56
Plant Area
n/a
Annual Production 200,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,156 868,992
kWh
Natural Gas $14,929 2,757
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,867 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,404

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7226: Use computer programs to optimize hvac performance $8,672 $16,500 $8,672
98,769
kWh
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,463 - $11,463
-
kWh
-
03 2.8114: Change rate schedules or other changes in utility service $10,562 - $10,562
-
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $216 $69 $216
2,345
kWh
-
05 2.8114: Change rate schedules or other changes in utility service $570 $250 - $570
-
MMBtu
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,384 $6,500 $15,080
75,029
kWh
$(-1,696.0)
-
MMBtu
TOTAL RECOMMENDED $44,867 $23,319 $45,993
176,143
kWh
$(-1,126.0)
-
MMBtu
TOTAL IMPLEMENTED $33,404 $23,319 $34,530
176,143
kWh
$(-1,126.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs