| Assessment Year | 2021 |
|---|---|
| Principal Product | Gear/Progressing Cavity Pumps & Flow Dividers |
| NAICS | 333911: Pump and Pumping Equipment Manufacturing |
| SIC | 3561: Pumps and Pumping Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 168 |
| Plant Area |
150,000
ft2
|
| Annual Production | 29,520
units
|
| Production Hrs. Annual | 4,810
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $657,427 | 6,242,952 |
kWh
|
$0.11 |
| Natural Gas | $106,736 | 12,227 |
MMBtu
|
$8.73 |
| TOTAL YEARLY COSTS | $764,163 | |||
| RECOMMENDED SAVINGS* | $174,058 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $93,855 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $17,635 | $350 |
$20,235
192,167
kWh
|
- | $(-2,600.0) | |
| 02 | 2.7229: Air condition only space necessary | $4,101 | $200 |
$918
8,715
kWh
|
$3,183
-
MMBtu
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,872 | $1,050 |
$18,772
178,269
kWh
|
- | $(-2,900.0) | |
| 04 | 2.2625: Chill water to the highest temperature possible | $1,152 | $250 |
$1,152
10,942
kWh
|
- | - | |
| 05 | 2.7261: Install timers and/or thermostats | $3,211 | $1,067 |
$2,851
27,071
kWh
|
$360
-
MMBtu
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $53,036 | $38,422 |
$53,036
503,665
kWh
|
- | - | |
| 07 | 2.2511: Insulate bare equipment | $1,020 | $813 | - |
$1,020
-
MMBtu
|
- | |
| 08 | 2.9114: Use solar heat to make electricty | $78,031 | $737,508 |
$78,031
739,059
kWh
|
- | - | |
| TOTAL RECOMMENDED | $174,058 | $779,660 |
$174,994
1,659,888
kWh
|
$4,564
-
MMBtu
|
$(-5,500.0) | ||
| TOTAL IMPLEMENTED | $93,855 | $41,089 |
$95,811
909,887
kWh
|
$3,544
-
MMBtu
|
$(-5,500.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs