Assessment Year | 2004 |
---|---|
Principal Product | printing |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
140,000
ft2
|
Annual Production | 3,800,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $66,892 | 1,490,750 |
kWh
|
$0.045 |
Electricity Demand | $15,469 | 4,404 |
kW-mo/yr
|
$3.51 |
Electricity Fees | $6,921 | - |
|
- |
Natural Gas | $39,210 | 5,198 |
MMBtu
|
$7.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,680 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,720 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $775 | $344 |
$517
18,120
kWh
|
$258
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,335 | $31,871 |
$5,548
194,712
kWh
|
$2,787
-
kW-mo/yr
|
- | - | - | |
03 | 2.7135: Install occupancy sensors | $1,094 | $888 |
$1,094
38,368
kWh
|
- | - | - | - | |
04 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $1,701 | $1,500 |
$8
465
kWh
|
$267
-
kW-mo/yr
|
$1,426
-
MMBtu
|
- | - | |
05 | 4.431: Train operators for maximum operating efficiency | $10,625 | $538 | - | - | - | - | $10,625 | |
06 | 4.131: Modify process to reduce material use/cost | $7,150 | $715 | - | - | - | $7,150 | - | |
TOTAL RECOMMENDED | $29,680 | $35,856 |
$7,167
251,665
kWh
|
$3,312
-
kW-mo/yr
|
$1,426
-
MMBtu
|
$7,150 | $10,625 | ||
TOTAL IMPLEMENTED | $10,720 | $3,447 |
$1,619
56,953
kWh
|
$525
-
kW-mo/yr
|
$1,426
-
MMBtu
|
$7,150 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs