1,396
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Fluid milk | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| DL0191 #01 Y:2021 | 01 | 2021 | Utilize controls to operate equipment only when needed | $2,696 | - | |
| AM0818 #10 Y:2021 | 10 | 2021 | Turn off equipment when not in use | $160 | $150 | |
| AM0818 #09 Y:2021 | 09 | 2021 | Pay utility bills on time | $256 | - | |
| AM0818 #08 Y:2021 | 08 | 2021 | Install occupancy sensors | $340 | $550 | |
| AM0818 #07 Y:2021 | 07 | 2021 | Use photocell controls | $700 | $450 | |
| AM0818 #06 Y:2021 | 06 | 2021 | Establish a predictive maintenance program | $1,910 | $4,570 | |
| AM0818 #05 Y:2021 | 05 | 2021 | Insulate bare equipment | $3,170 | $524 | |
| AM0818 #04 Y:2021 | 04 | 2021 | Repair or replace steam traps | $7,500 | $1,300 | |
| AM0818 #03 Y:2021 | 03 | 2021 | Reduce the pressure of compressed air to the minimum required | $14,800 | $1,260 | |
| AM0818 #02 Y:2021 | 02 | 2021 | Reduce the pressure of compressed air to the minimum required | $21,370 | $45 | |
| AM0818 #01 Y:2021 | 01 | 2021 | Apply for tax-free status for energy purchases | $1,029,555 | $25,000 | |
| UA0227 #07 Y:2020 | 07 | 2020 | Utilize higher efficiency lamps and/or ballasts | $8,570 | $5,639 | |
| UA0227 #06 Y:2020 | 06 | 2020 | Modify refrigeration system to operate at a lower pressure | $3,578 | $200 | |
| UA0227 #05 Y:2020 | 05 | 2020 | Recover waste heat from equipment | $45,805 | $100,000 | |
| UA0227 #04 Y:2020 | 04 | 2020 | Replace obsolete burners with more efficient ones | $65,276 | $72,800 | |
| UA0227 #03 Y:2020 | 03 | 2020 | Reduce the pressure of compressed air to the minimum required | $19,527 | $250 | |
| UA0227 #02 Y:2020 | 02 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $15,466 | $1,345 | |
| UA0227 #01 Y:2020 | 01 | 2020 | Use adjustable frequency drive or multiple speed motors on existing system | $13,028 | $2,600 | |
| UK2001 #11 Y:2020 | 11 | 2020 | Optimize plant power factor | $31,564 | $19,285 | |
| UK2001 #10 Y:2020 | 10 | 2020 | Replace boiler | $10,114 | $45,600 |