Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,396

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fluid milk
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0191 #01 Y:2021 Utilize controls to operate equipment only when needed $2,696 -
AM0818 #10 Y:2021 Turn off equipment when not in use $160 $150
AM0818 #09 Y:2021 Pay utility bills on time $256 -
AM0818 #08 Y:2021 Install occupancy sensors $340 $550
AM0818 #07 Y:2021 Use photocell controls $700 $450
AM0818 #06 Y:2021 Establish a predictive maintenance program $1,910 $4,570
AM0818 #05 Y:2021 Insulate bare equipment $3,170 $524
AM0818 #04 Y:2021 Repair or replace steam traps $7,500 $1,300
AM0818 #03 Y:2021 Reduce the pressure of compressed air to the minimum required $14,800 $1,260
AM0818 #02 Y:2021 Reduce the pressure of compressed air to the minimum required $21,370 $45
AM0818 #01 Y:2021 Apply for tax-free status for energy purchases $1,029,555 $25,000
UA0227 #07 Y:2020 Utilize higher efficiency lamps and/or ballasts $8,570 $5,639
UA0227 #06 Y:2020 Modify refrigeration system to operate at a lower pressure $3,578 $200
UA0227 #05 Y:2020 Recover waste heat from equipment $45,805 $100,000
UA0227 #04 Y:2020 Replace obsolete burners with more efficient ones $65,276 $72,800
UA0227 #03 Y:2020 Reduce the pressure of compressed air to the minimum required $19,527 $250
UA0227 #02 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $15,466 $1,345
UA0227 #01 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $13,028 $2,600
UK2001 #11 Y:2020 Optimize plant power factor $31,564 $19,285
UK2001 #10 Y:2020 Replace boiler $10,114 $45,600