ITAC Assessment: AM0818
ITAC logo
ITAC Assessment: AM0818
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Dairy products
NAICS 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2026: Fluid Milk
Sales Range $100
M
to 500
M
# of Employees 470
Plant Area 350,000
ft2
Annual Production 250,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,527,924 37,822,090
kWh
Electricity Demand $588,002 77,300
kW-mo/yr
Electricity Fees $212,832 -
Natural Gas $755,380 274,100
MMBtu
Waste Disposal Costs
Water Usage $1,589,760 227,000
Tgal
TOTAL YEARLY COSTS $4,673,898
RECOMMENDED SAVINGS* $1,079,761 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,041,681

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $1,029,555 $25,000 - - $205,911 - - $823,644
02 2.4231: Reduce the pressure of compressed air to the minimum required $21,370 $45 $16,300
450,700
kWh
$5,070
-
kW-mo/yr
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $14,800 $1,260 $14,800
412,000
kWh
- - - - -
04 2.2113: Repair or replace steam traps $7,500 $1,300 - - - $7,500
-
MMBtu
- -
05 2.2511: Insulate bare equipment $3,170 $524 - - - $3,170
-
MMBtu
- -
06 2.4157: Establish a predictive maintenance program $1,910 $4,570 $680
19,030
kWh
- - - $1,230 -
07 2.7134: Use photocell controls $700 $450 $400
11,000
kWh
$300
-
kW-mo/yr
- - - -
08 2.7135: Install occupancy sensors $340 $550 $340
9,350
kWh
- - - - -
09 2.8123: Pay utility bills on time $256 - - - $256 - - -
10 2.6218: Turn off equipment when not in use $160 $150 $160
4,400
kWh
- - - - -
TOTAL RECOMMENDED $1,079,761 $33,849 $32,680
906,480
kWh
$5,370
-
kW-mo/yr
$206,167 $10,670
-
MMBtu
$1,230 $823,644
TOTAL IMPLEMENTED $1,041,681 $27,974 $900
24,750
kWh
$300
-
kW-mo/yr
$206,167 $10,670
-
MMBtu
- $823,644
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs