Assessment Year 1996
Principal Product felt for shingles
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $5
M
to 10
M
# of Employees 54
Plant Area
n/a
Annual Production 40,000
ton
Production Hrs. Annual 8,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $505,519 17,718,640
kWh
Electricity Demand $317,661 32,088
kW-mo/yr
Natural Gas $1,000,529 400,212
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $117,709 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $117,709

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
01 2.3212: Optimize plant power factor $25,819 $30,000 - $25,819
-
kW-mo/yr
- - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,461 $3,112 $1,705
81,184
kWh
$1,477
-
kW-mo/yr
- - - $3,279 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,228 $3,710 $525
24,912
kWh
$455
-
kW-mo/yr
- - - $248 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,011 $1,380 $671
31,946
kWh
$135
-
kW-mo/yr
- - - $205 -
05 3.4151: Minimize water usage $14,124 - - - - $10,660
-
Tgal
- - $3,464
-
Tgal
06 3.4154: Eliminate leaks in water lines and valves $4,054 $200 - - - $3,060
-
Tgal
- - $994
-
Tgal
07 3.4155: Meter waste water $30,899 $1,000 - - - $23,320
-
Tgal
- - $7,579
-
Tgal
08 2.2163: Use minimum steam operating pressure $4,188 - - - $4,188
-
MMBtu
- - - -
09 2.2511: Insulate bare equipment $628 $2,040 - - $628
-
MMBtu
- - - -
10 4.321: Optimize production lot sizes and inventories $29,297 - $1,665
79,132
kWh
$3,894
-
kW-mo/yr
- - $23,738 - -
TOTAL RECOMMENDED $117,709 $41,442 $4,566
217,174
kWh
$31,780
-
kW-mo/yr
$4,816
-
MMBtu
$37,040
-
Tgal
$23,738 $3,732 $12,037
-
Tgal
TOTAL IMPLEMENTED $117,709 $41,442 $4,566
217,174
kWh
$31,780
-
kW-mo/yr
$4,816
-
MMBtu
$37,040
-
Tgal
$23,738 $3,732 $12,037
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs