ITAC Assessment: SU0544
ITAC logo
ITAC Assessment: SU0544
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Antenna
NAICS 334220: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 2,000,000
units
Production Hrs. Annual 6,422
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,998 1,596,290
kWh
Electricity Demand $39,532 3,329
kW-mo/yr
Electricity Fees $19,777 -
Natural Gas $10,622 1,280
MMBtu
TOTAL YEARLY COSTS $166,929
RECOMMENDED SAVINGS* $40,749 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,243

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3132: Recharge batteries on during off-peak demand periods $2,993 - - - - $2,993
02 2.7122: Disconnect ballasts $3,711 - $1,804
29,570
kWh
$1,907
-
kW-mo/yr
- -
03 2.8121: Apply for tax-free status for energy purchases $9,171 - - - - $9,171
04 2.8121: Apply for tax-free status for energy purchases $721 - - - - $721
05 2.7224: Reduce space conditioning during non-working hours $185 - - - $185
-
MMBtu
-
06 2.4322: Use or replace with energy efficient substitutes $649 - $311
5,100
kWh
$356
-
kW-mo/yr
$(-18.1)
-
MMBtu
-
07 2.2511: Insulate bare equipment $1,502 $400 - - $1,502
-
MMBtu
-
08 2.7314: Reduce ventilation air $2,756 $10,000 $462
7,585
kWh
- $2,294
-
MMBtu
-
09 2.7135: Install occupancy sensors $417 $200 $417
6,833
kWh
- - -
10 2.9114: Use solar heat to make electricty $17,390 $29,395 $17,390
285,090
kWh
- - -
11 2.6211: Conserve energy by efficient use of vending machines $561 - $561
9,198
kWh
- - -
12 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $693 $600 $693
11,360
kWh
- - -
TOTAL RECOMMENDED $40,749 $40,595 $21,638
354,736
kWh
$2,263
-
kW-mo/yr
$3,963
-
MMBtu
$12,885
TOTAL IMPLEMENTED $16,243 $1,200 $1,671
27,391
kWh
- $1,687
-
MMBtu
$12,885
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs