ITAC Assessment: NV0073
ITAC logo
ITAC Assessment: NV0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Bottled Soft Drinks
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 140,000
ft2
Annual Production 6,000,000
units
Production Hrs. Annual 4,680
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,283 3,155,627
kWh
Electricity Demand $71,982 9,412
kW-mo/yr
Electricity Fees $17,241 -
Natural Gas $18,411 3,460
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,347 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,115

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $366 $100 $366
6,155
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $823 $208 $573
9,965
kWh
$250
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $863 $163 $689
11,723
kWh
$174
-
kW-mo/yr
-
04 2.7134: Use photocell controls $10,850 $860 $5,197
89,097
kWh
$5,653
-
kW-mo/yr
-
05 2.6231: Utilize controls to operate equipment only when needed $1,700 $2,000 $1,700
29,015
kWh
- -
06 2.6212: Turn off equipment during breaks, reduce operating time $630 $700 $630
10,844
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $881 $310 $881
15,240
kWh
- -
08 2.4133: Use most efficient type of electric motors $721 $69 $554
25,791
kWh
$167
-
kW-mo/yr
-
09 3.4151: Minimize water usage $513 - - - $513
-
Tgal
TOTAL RECOMMENDED $17,347 $4,410 $10,590
197,830
kWh
$6,244
-
kW-mo/yr
$513
-
Tgal
TOTAL IMPLEMENTED $15,115 $3,331 $8,525
145,955
kWh
$6,077
-
kW-mo/yr
$513
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs