ITAC Assessment: UA0227
ITAC logo
ITAC Assessment: UA0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Fluid Dairy Products
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $100
M
to 500
M
# of Employees 97
Plant Area 49,037
ft2
Annual Production 169,896,413
lb
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $617,932 9,817,800
kWh
Electricity Demand $208,633 19,682
kW-mo/yr
Electricity Fees $(-59,569.0) -
Natural Gas $317,843 86,927
MMBtu
TOTAL YEARLY COSTS $1,084,839
RECOMMENDED SAVINGS* $171,250 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $89,312

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,028 $2,600 $5,666
90,015
kWh
$8,374
-
kW-mo/yr
$(-1,012.0) -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,466 $1,345 $14,254
226,464
kWh
$2,414
-
kW-mo/yr
$(-1,202.0) -
03 2.4231: Reduce the pressure of compressed air to the minimum required $19,527 $250 $15,681
249,140
kWh
$5,363
-
kW-mo/yr
$(-1,517.0) -
04 2.1221: Replace obsolete burners with more efficient ones $65,276 $72,800 - - - $65,276
-
MMBtu
05 2.2437: Recover waste heat from equipment $45,805 $100,000 - - - $45,805
-
MMBtu
06 2.2621: Modify refrigeration system to operate at a lower pressure $3,578 $200 $3,090
49,092
kWh
$766
-
kW-mo/yr
$(-278.0) -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $8,570 $5,639 $7,509
119,308
kWh
$1,727
-
kW-mo/yr
$(-666.0) -
TOTAL RECOMMENDED $171,250 $182,834 $46,200
734,019
kWh
$18,644
-
kW-mo/yr
$(-4,675.0) $111,081
-
MMBtu
TOTAL IMPLEMENTED $89,312 $79,784 $21,763
345,772
kWh
$4,141
-
kW-mo/yr
$(-1,868.0) $65,276
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs