Assessment Year | 2020 |
---|---|
Principal Product | Fluid Dairy Products |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $100 M to 500M |
# of Employees | 97 |
Plant Area |
49,037
ft2
|
Annual Production | 169,896,413
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $617,932 | 9,817,800 |
kWh
|
$0.063 |
Electricity Demand | $208,633 | 19,682 |
kW-mo/yr
|
$10.60 |
Electricity Fees | $(-59,569.0) | - |
|
- |
Natural Gas | $317,843 | 86,927 |
MMBtu
|
$3.66 |
TOTAL YEARLY COSTS | $1,084,839 | |||
RECOMMENDED SAVINGS* | $171,250 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $89,312 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,028 | $2,600 |
$5,666
90,015
kWh
|
$8,374
-
kW-mo/yr
|
$(-1,012.0) | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,466 | $1,345 |
$14,254
226,464
kWh
|
$2,414
-
kW-mo/yr
|
$(-1,202.0) | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $19,527 | $250 |
$15,681
249,140
kWh
|
$5,363
-
kW-mo/yr
|
$(-1,517.0) | - | |
04 | 2.1221: Replace obsolete burners with more efficient ones | $65,276 | $72,800 | - | - | - |
$65,276
-
MMBtu
|
|
05 | 2.2437: Recover waste heat from equipment | $45,805 | $100,000 | - | - | - |
$45,805
-
MMBtu
|
|
06 | 2.2621: Modify refrigeration system to operate at a lower pressure | $3,578 | $200 |
$3,090
49,092
kWh
|
$766
-
kW-mo/yr
|
$(-278.0) | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,570 | $5,639 |
$7,509
119,308
kWh
|
$1,727
-
kW-mo/yr
|
$(-666.0) | - | |
TOTAL RECOMMENDED | $171,250 | $182,834 |
$46,200
734,019
kWh
|
$18,644
-
kW-mo/yr
|
$(-4,675.0) |
$111,081
-
MMBtu
|
||
TOTAL IMPLEMENTED | $89,312 | $79,784 |
$21,763
345,772
kWh
|
$4,141
-
kW-mo/yr
|
$(-1,868.0) |
$65,276
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs