ITAC Assessment: DL0191
ITAC logo
ITAC Assessment: DL0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Dairy Products
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 20,000
ft2
Annual Production 180
Tgal
Production Hrs. Annual 6,550
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,965 817,196
kWh
Electricity Demand $15,083 2,465
kW-mo/yr
Electricity Fees $4,450 -
Natural Gas $38,638 6,959
MMBtu
Waste Disposal Costs
Water Usage $30,903 5,045
Tgal
TOTAL YEARLY COSTS $175,039
RECOMMENDED SAVINGS* $29,578 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings
01 2.6231: Utilize controls to operate equipment only when needed $2,696 - $2,696
21,740
kWh
- -
02 2.6231: Utilize controls to operate equipment only when needed $3,827 - $3,827
31,041
kWh
- -
03 2.7211: Clean and maintain refrigerant condensers and towers $3,622 $600 $3,622
29,208
kWh
- -
04 2.2136: Install / repair insulation on steam lines $818 $168 - $818
-
MMBtu
-
05 3.3132: Use reverse osmosis to concentrate material $5,413 $1,000 - $3,091
-
MMBtu
$2,322
-
Tgal
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,208 $38 $834
6,724
kWh
$374
-
MMBtu
-
07 2.2437: Recover waste heat from equipment $1,032 $4,500 - $1,032
-
MMBtu
-
08 2.7261: Install timers and/or thermostats $687 $333 $89
707
kWh
$598
-
MMBtu
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,391 $1,527 $1,391
10,653
kWh
- -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,846 $1,500 $1,846
14,885
kWh
- -
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,536 $925 $1,536
12,390
kWh
- -
12 2.2621: Modify refrigeration system to operate at a lower pressure $5,502 $22,000 $5,502
44,370
kWh
- -
TOTAL RECOMMENDED $29,578 $32,591 $21,343
171,718
kWh
$5,913
-
MMBtu
$2,322
-
Tgal
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs