Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

718

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Poultry slaughtering and processing
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0279 #08 Y:2023 Use waste heat from hot flue gases to preheat $3,175 $54,709
UA0279 #07 Y:2023 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $161,801 $1,711,707
UA0279 #06 Y:2023 Utilize energy-efficient belts and other improved mechanisms $10,016 $384
UA0279 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $1,977 $7,874
UA0279 #04 Y:2023 Install timers and/or thermostats $3,760 $1,407
UA0279 #03 Y:2023 Reduce the pressure of compressed air to the minimum required $15,760 $1,000
UA0279 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $21,676 $8,591
UA0279 #01 Y:2023 Install occupancy sensors $1,228 $2,262
LS2311 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $11,014 $39,200
LS2311 #04 Y:2023 Replace boiler $81,818 $210,000
LS2311 #03 Y:2023 Use most efficient type of electric motors $3,096 $3,700
LS2311 #02 Y:2023 Install vinyl strip / high speed / air curtain doors $3,795 $560
LS2311 #01 Y:2023 Reduce the pressure of compressed air to the minimum required $1,616 $25
IC0278 #04 Y:2023 Eliminate leaks in water lines and valves $5,040 $600
IC0278 #03 Y:2023 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $175,901 $710,922
IC0278 #02 Y:2023 Use waste heat from hot flue gases to preheat incoming fluids $5,879 $15,415
IC0278 #01 Y:2023 Use solar heat to make electricty $147,541 $1,271,712
LE0543 #06 Y:2023 Use properly designed and sized hvac equipment $2,075 $13,169
LE0543 #05 Y:2023 Replace existing hvac unit with high efficiency model $2,200 $9,000
LE0543 #04 Y:2023 Insulate bare equipment $210 $760