ITAC Assessment: IC0278
ITAC logo
ITAC Assessment: IC0278
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Lean Beef and Edible Beef Tallow
NAICS 311613: Rendering and Meat Byproduct Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $50
M
to 100
M
# of Employees 35
Plant Area 28,000
ft2
Annual Production 64,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $380,827 3,686,592
kWh
Electricity Demand $86,199 6,303
kW-mo/yr
Electricity Fees $3,761 -
Natural Gas $162,073 22,547
MMBtu
Waste Disposal Costs
Water Usage $91,774 13,425
Tgal
TOTAL YEARLY COSTS $724,634
RECOMMENDED SAVINGS* $334,361 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,040

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.9114: Use solar heat to make electricty $147,541 $1,271,712 $136,642
1,366,423
kWh
$10,898
-
kW-mo/yr
- -
02 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $5,879 $15,415 - - $5,879
-
MMBtu
-
03 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $175,901 $710,922 $271,042
(-291,443)
kWh
- $(-95,140.8)
-
MMBtu
-
04 3.4154: Eliminate leaks in water lines and valves $5,040 $600 - - - $5,040
-
Tgal
TOTAL RECOMMENDED $334,361 $1,998,649 $407,684
1,074,980
kWh
$10,898
-
kW-mo/yr
$(-89,261.6)
-
MMBtu
$5,040
-
Tgal
TOTAL IMPLEMENTED $5,040 $600 - - - $5,040
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs