| Assessment Year | 2023 |
|---|---|
| Principal Product | Lean Beef and Edible Beef Tallow |
| NAICS | 311613: Rendering and Meat Byproduct Processing |
| SIC | 2015: Poultry Slaughtering and Processing |
| Sales Range | $50 M to 100M |
| # of Employees | 35 |
| Plant Area |
28,000
ft2
|
| Annual Production | 64,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $380,827 | 3,686,592 |
kWh
|
$0.10 | |
| Electricity Demand | $86,199 | 6,303 |
kW-mo/yr
|
$13.68 | |
| Electricity Fees | $3,761 | - |
|
- | |
| Natural Gas | $162,073 | 22,547 |
MMBtu
|
$7.19 | |
| Waste Disposal Costs | |||||
| Water Usage | $91,774 | 13,425 |
Tgal
|
$6.84 | |
| TOTAL YEARLY COSTS | $724,634 | ||||
| RECOMMENDED SAVINGS* | $334,361 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $5,040 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $147,541 | $1,271,712 |
$136,642
1,366,423
kWh
|
$10,898
-
kW-mo/yr
|
- | - | |
| 02 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $5,879 | $15,415 | - | - |
$5,879
-
MMBtu
|
- | |
| 03 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $175,901 | $710,922 |
$271,042
(-291,443)
kWh
|
- |
$(-95,140.8)
-
MMBtu
|
- | |
| 04 | 3.4154: Eliminate leaks in water lines and valves | $5,040 | $600 | - | - | - |
$5,040
-
Tgal
|
|
| TOTAL RECOMMENDED | $334,361 | $1,998,649 |
$407,684
1,074,980
kWh
|
$10,898
-
kW-mo/yr
|
$(-89,261.6)
-
MMBtu
|
$5,040
-
Tgal
|
||
| TOTAL IMPLEMENTED | $5,040 | $600 | - | - | - |
$5,040
-
Tgal
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs