ITAC Assessment: LS2311
ITAC logo
ITAC Assessment: LS2311
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Poultry Processing
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $100
M
to 500
M
# of Employees 498
Plant Area 343,244
ft2
Annual Production 33,800,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,113,302 21,235,200
kWh
Natural Gas $375,911 45,388
MMBtu
TOTAL YEARLY COSTS $2,489,213
RECOMMENDED SAVINGS* $101,339 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,521

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,616 $25 $1,616
16,158
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $3,795 $560 $3,795
37,948
kWh
-
03 2.4133: Use most efficient type of electric motors $3,096 $3,700 $3,096
30,964
kWh
-
04 2.1224: Replace boiler $81,818 $210,000 - $81,818
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,014 $39,200 $11,014
110,140
kWh
-
TOTAL RECOMMENDED $101,339 $253,485 $19,521
195,210
kWh
$81,818
-
MMBtu
TOTAL IMPLEMENTED $19,521 $43,485 $19,521
195,210
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs