ITAC Assessment: BD0033
ITAC logo
ITAC Assessment: BD0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Semi Trailers
NAICS
n/a
SIC 3715: Truck Trailers
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area 178,200
ft2
Annual Production 5,200
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,904 2,793,669
kWh
Natural Gas $22,290 5,928
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,322 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $1,652 $500 n/a $1,652
24,619
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $274 $400 n/a $274
4,103
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $3,800 $180 n/a $3,800
56,565
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $463 $391 n/a $463
7,034
kWh
-
05 2.7492: Use proper thickness of insulation on building envelope $990 $1,550 n/a - $990
-
MMBtu
06 2.4133: Use most efficient type of electric motors $4,667 $12,480 n/a $4,667
69,461
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,476 $350 n/a $1,476
21,981
kWh
-
TOTAL RECOMMENDED $13,322 $15,851 $12,332
183,763
kWh
$990
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs