ITAC Assessment: UA0279
ITAC logo
ITAC Assessment: UA0279
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Poultry Based Ingredients
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $50
M
to 100
M
# of Employees 130
Plant Area 117,500
ft2
Annual Production 270,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,207,821 12,578,029
kWh
Natural Gas $1,956,964 298,448
MMBtu
TOTAL YEARLY COSTS $3,164,785
RECOMMENDED SAVINGS* $219,393 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,424

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $1,228 $2,262 $1,228
12,789
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,676 $8,591 $21,676
225,794
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $15,760 $1,000 $15,760
163,232
kWh
- -
04 2.7261: Install timers and/or thermostats $3,760 $1,407 $3,760
39,175
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,977 $7,874 $1,977
20,589
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,016 $384 $10,016
104,336
kWh
- -
07 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $161,801 $1,711,707 $142,733
1,486,800
kWh
$54,156
-
MMBtu
$(-35,088.0)
08 2.2414: Use waste heat from hot flue gases to preheat $3,175 $54,709 - $3,175
-
MMBtu
-
TOTAL RECOMMENDED $219,393 $1,787,934 $197,150
2,052,715
kWh
$57,331
-
MMBtu
$(-35,088.0)
TOTAL IMPLEMENTED $42,424 $13,260 $42,424
440,990
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs