ITAC Assessment: MS0333
ITAC logo
ITAC Assessment: MS0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Furniture
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $10
M
to 50
M
# of Employees 195
Plant Area 311,000
ft2
Annual Production 73,000
pieces
Production Hrs. Annual 2,025
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,426 2,909,998
kWh
Electricity Demand $142,502 12,392
kW-mo/yr
Electricity Fees $7,185 -
Natural Gas $8,829 735
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,805 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $17,650 $3,573 $7,856
148,842
kWh
$9,533
-
kW-mo/yr
$261 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,880 $32,852 $3,512
66,369
kWh
$4,252
-
kW-mo/yr
$116 -
03 2.6214: Shut off pilots in standby equipment $2,636 $142 - - - $2,636
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,936 $259 $1,907
36,059
kWh
- $29 -
05 2.4226: Use / purchase optimum sized compressor $1,683 $3,154 $1,658
31,344
kWh
- $25 -
06 2.7447: Install vinyl strip / high speed / air curtain doors $1,247 $656 $1,228
23,211
kWh
- $19 -
07 2.2437: Recover waste heat from equipment $1,170 - - - - $1,170
-
MMBtu
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,070 $2,463 $412
7,787
kWh
$642
-
kW-mo/yr
$16 -
09 2.4221: Install compressor air intakes in coolest locations $533 $635 $111
2,100
kWh
$414
-
kW-mo/yr
$8 -
TOTAL RECOMMENDED $35,805 $43,734 $16,684
315,712
kWh
$14,841
-
kW-mo/yr
$474 $3,806
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs