Assessment Year | 2014 |
---|---|
Principal Product | Salami |
NAICS | 311612: Meat Processed from Carcasses |
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $10 M to 50M |
# of Employees | 37 |
Plant Area |
7,474
ft2
|
Annual Production | 4,500,000
lb
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $68,794 | 606,770 |
kWh
|
$0.11 |
Electricity Demand | $13,966 | 1,813 |
kW-mo/yr
|
$7.70 |
Electricity Fees | $23,830 | - |
|
- |
Natural Gas | $27,391 | 2,741 |
MMBtu
|
$9.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,463 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,706 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $11,599 | - |
$11,599
102,644
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $555 | - |
$401
3,526
kWh
|
$154
-
kW-mo/yr
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,119 | - |
$803
7,108
kWh
|
$316
-
kW-mo/yr
|
|
04 | 2.7261: Install timers and/or thermostats | $1,431 | $1,516 |
$1,431
12,667
kWh
|
- | |
05 | 2.4112: Install soft-start to eliminate nuisance trips | $2,534 | $4,030 | - |
$2,534
-
kW-mo/yr
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $792 | $2,500 |
$569
5,032
kWh
|
$223
-
kW-mo/yr
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,433 | $8,016 |
$1,028
9,100
kWh
|
$404
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $19,463 | $16,062 |
$15,831
140,077
kWh
|
$3,631
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $14,706 | $8,016 |
$13,832
122,378
kWh
|
$874
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs