ITAC Assessment: LE0382
ITAC logo
ITAC Assessment: LE0382
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Salami
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 37
Plant Area 7,474
ft2
Annual Production 4,500,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,794 606,770
kWh
Electricity Demand $13,966 1,813
kW-mo/yr
Electricity Fees $23,830 -
Natural Gas $27,391 2,741
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,463 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,706

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $11,599 - $11,599
102,644
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $555 - $401
3,526
kWh
$154
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,119 - $803
7,108
kWh
$316
-
kW-mo/yr
04 2.7261: Install timers and/or thermostats $1,431 $1,516 $1,431
12,667
kWh
-
05 2.4112: Install soft-start to eliminate nuisance trips $2,534 $4,030 - $2,534
-
kW-mo/yr
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $792 $2,500 $569
5,032
kWh
$223
-
kW-mo/yr
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,433 $8,016 $1,028
9,100
kWh
$404
-
kW-mo/yr
TOTAL RECOMMENDED $19,463 $16,062 $15,831
140,077
kWh
$3,631
-
kW-mo/yr
TOTAL IMPLEMENTED $14,706 $8,016 $13,832
122,378
kWh
$874
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs