Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chemical and fertilizer mineral mining, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0478 #07 Y:2019 Optimize plant power factor $29,408 $113,315
SU0478 #06 Y:2019 Utilize higher efficiency lamps and/or ballasts $8,321 $75,548
SU0478 #05 Y:2019 Install occupancy sensors $1,130 $1,973
SU0478 #04 Y:2019 Utilize higher efficiency lamps and/or ballasts $385 $528
SU0478 #03 Y:2019 Install compressor air intakes in coolest locations $1,685 $1,302
SU0478 #02 Y:2019 Conserve energy by efficient use of vending machines $468 $253
SU0478 #01 Y:2019 Use or replace with energy efficient substitutes $2,670 $260
OK0957 #07 Y:2016 Use most efficient type of electric motors $9,997 $29,582
OK0957 #06 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $18,059 $52,806
OK0957 #05 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $6,973 $8,747
OK0957 #04 Y:2016 Reduce the pressure of compressed air to the minimum required $2,025 -
OK0957 #03 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $4,710 $2,100
OK0957 #02 Y:2016 Utilize higher efficiency lamps and/or ballasts $890 $1,320
OK0957 #01 Y:2016 Utilize higher efficiency lamps and/or ballasts $1,200 $2,994
OR0621 #03 Y:2013 Replace hydraulic / pneumatic equipment with electric equipment $423 $13,505
OR0621 #02 Y:2013 Utilize higher efficiency lamps and/or ballasts $9,765 $65,592
OR0621 #01 Y:2013 Improve combustion control capability $1,962 $2,256
AS0307 #07 Y:2001 Install automatic packing equipment $237,120 $280,000
AS0307 #06 Y:2001 Install equipment (eg compactor) to reduce disposal costs $3,703 $60
AS0307 #05 Y:2001 Reduce the pressure of compressed air to the minimum required $1,586 $60