Assessment Year | 2016 |
---|---|
Principal Product | Salt |
NAICS | 212399: All Other Nonmetallic Mineral Mining |
SIC | 1479: Chemical and Fertilizer Mineral Mining, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 56 |
Plant Area |
440,000
ft2
|
Annual Production | 500,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $155,809 | 4,097,600 |
kWh
|
$0.038 |
Electricity Demand | $283,826 | 14,798 |
kW-mo/yr
|
$19.18 |
Natural Gas | $45,607 | 10,648 |
MMBtu
|
$4.28 |
TOTAL YEARLY COSTS | $485,242 | |||
RECOMMENDED SAVINGS* | $43,854 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,767 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,200 | $2,994 |
$816
21,474
kWh
|
$384
-
kW-mo/yr
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $890 | $1,320 |
$449
11,825
kWh
|
$441
-
kW-mo/yr
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,710 | $2,100 |
$4,710
123,947
kWh
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,025 | - |
$2,025
53,290
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,973 | $8,747 |
$6,973
183,505
kWh
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,059 | $52,806 |
$18,059
475,224
kWh
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $9,997 | $29,582 |
$2,172
57,149
kWh
|
$7,825
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $43,854 | $97,549 |
$35,204
926,414
kWh
|
$8,650
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $31,767 | $63,653 |
$31,767
835,966
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs