Assessment Year | 2001 |
---|---|
Principal Product | Salt |
NAICS |
n/a
|
SIC | 1479: Chemical and Fertilizer Mineral Mining, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 36 |
Plant Area |
5,662,800
ft2
|
Annual Production | 126,000
ton
|
Production Hrs. Annual | 5,638
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $174,598 | 2,572,063 |
kWh
|
$0.068 |
Electricity Demand | $10,531 | 6,361 |
kW-mo/yr
|
$1.66 |
Electricity Fees | $11,381 | - |
|
- |
Natural Gas | $175,806 | 30,270 |
MMBtu
|
$5.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $248,440 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $328 | $530 |
$328
7,192
kWh
|
- | - | - | - | |
02 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $4,902 | $30,252 | - | - |
$4,902
-
MMBtu
|
- | - | |
03 | 2.7135: Install occupancy sensors | $88 | $225 |
$46
1,004
kWh
|
$42
-
kW-mo/yr
|
- | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $713 | $735 |
$522
11,476
kWh
|
$191
-
kW-mo/yr
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,586 | $60 |
$1,162
25,510
kWh
|
$424
-
kW-mo/yr
|
- | - | - | |
06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,703 | $60 | - | - | - | - | $3,703 | |
07 | 4.441: Install automatic packing equipment | $237,120 | $280,000 | n/a | - | - | - | $237,120 | - |
TOTAL RECOMMENDED | $248,440 | $311,862 |
$2,058
45,182
kWh
|
$657
-
kW-mo/yr
|
$4,902
-
MMBtu
|
$237,120 | $3,703 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs