ITAC Assessment: LL0120
ITAC logo
ITAC Assessment: LL0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Nickel alloy and titanium alloy piping and tubing
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 133
Plant Area 125,000
ft2
Annual Production 2,000
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $654,061 9,640,294
kWh
Electricity Demand $3,863 23,155
kW-mo/yr
Electricity Fees $70,079 -
Natural Gas $235,842 63,263
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $404,294 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $173,750

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.2511: Insulate bare equipment $165,697 $5,304 $159,324
2,348,173
kWh
$6,373 - -
02 2.7134: Use photocell controls $8,053 $110 $7,743
114,120
kWh
$310 - -
03 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $205,089 $425,809 n/a $271,400
4,000,000
kWh
$7,888 $(-74,199.0)
-
MMBtu
-
04 2.2414: Use waste heat from hot flue gases to preheat $13,925 $7,125 - - $13,925
-
MMBtu
-
05 3.5313: Increase amount of waste recovered for resale $11,530 - - - - $11,530
-
lb
TOTAL RECOMMENDED $404,294 $438,348 $438,467
6,462,293
kWh
$14,571 $(-60,274.0)
-
MMBtu
$11,530
-
lb
TOTAL IMPLEMENTED $173,750 $5,414 $167,067
2,462,293
kWh
$6,683 - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs