ITAC Assessment: SU0478
ITAC logo
ITAC Assessment: SU0478
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Deicing Rock Salt
NAICS 212399: All Other Nonmetallic Mineral Mining
SIC 1479: Chemical and Fertilizer Mineral Mining, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 354
Plant Area 60,000
ft2
Annual Production 4,000,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,228,609 29,159,754
kWh
Electricity Demand $862,036 72,232
kW-mo/yr
Electricity Fees $104,152 -
Waste Disposal Costs
Water Usage $121,400 14,000
Tgal
Solid Waste (non-haz) $52,500 10,000
lb
TOTAL YEARLY COSTS $2,368,697
RECOMMENDED SAVINGS* $44,067 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,706

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $2,670 $260 $1,260
30,000
kWh
$2,237
-
kW-mo/yr
- $(-827.0)
-
MMBtu
- -
02 2.6211: Conserve energy by efficient use of vending machines $468 $253 $468
11,147
kWh
- - - - -
03 2.4221: Install compressor air intakes in coolest locations $1,685 $1,302 $1,685
40,116
kWh
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $385 $528 $98
2,348
kWh
$38
-
kW-mo/yr
- - $164 $85
05 2.7135: Install occupancy sensors $1,130 $1,973 $1,130
26,913
kWh
- - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $8,321 $75,548 $4,784
113,901
kWh
$239
-
kW-mo/yr
- - $2,624 $674
07 2.3212: Optimize plant power factor $29,408 $113,315 - - $29,408 - - -
TOTAL RECOMMENDED $44,067 $193,179 $9,425
224,425
kWh
$2,514
-
kW-mo/yr
$29,408 $(-827.0)
-
MMBtu
$2,788 $759
TOTAL IMPLEMENTED $8,706 $76,076 $4,882
116,249
kWh
$277
-
kW-mo/yr
- - $2,788 $759
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs