ITAC Assessment: OR0621
ITAC logo
ITAC Assessment: OR0621
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Sulfur
NAICS 212393: Other Chemical and Fertilizer Mineral Mining
SIC 1479: Chemical and Fertilizer Mineral Mining, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 10
Plant Area 287,469
ft2
Annual Production 84,000
units
Production Hrs. Annual 4,940
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,139 667,840
kWh
Electricity Demand $8,706 1,750
kW-mo/yr
Electricity Fees $620 -
Natural Gas $79,350 12,341
MMBtu
Fuel Oil #2 $8,475 346
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,765

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.1116: Improve combustion control capability $1,962 $2,256 - - $1,962
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,765 $65,592 $6,542
82,318
kWh
$1,190
-
kW-mo/yr
- $203 $1,830
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $423 $13,505 $423
5,714
kWh
- - - -
TOTAL RECOMMENDED $12,150 $81,353 $6,965
88,032
kWh
$1,190
-
kW-mo/yr
$1,962
-
MMBtu
$203 $1,830
TOTAL IMPLEMENTED $9,765 $65,592 $6,542
82,318
kWh
$1,190
-
kW-mo/yr
- $203 $1,830
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs