Assessment Year | 2013 |
---|---|
Principal Product | Sulfur |
NAICS | 212393: Other Chemical and Fertilizer Mineral Mining |
SIC | 1479: Chemical and Fertilizer Mineral Mining, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 10 |
Plant Area |
287,469
ft2
|
Annual Production | 84,000
units
|
Production Hrs. Annual | 4,940
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $49,139 | 667,840 |
kWh
|
$0.074 |
Electricity Demand | $8,706 | 1,750 |
kW-mo/yr
|
$4.97 |
Electricity Fees | $620 | - |
|
- |
Natural Gas | $79,350 | 12,341 |
MMBtu
|
$6.43 |
Fuel Oil #2 | $8,475 | 346 |
MMBtu
|
$24.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,150 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,765 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1116: Improve combustion control capability | $1,962 | $2,256 | - | - |
$1,962
-
MMBtu
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,765 | $65,592 |
$6,542
82,318
kWh
|
$1,190
-
kW-mo/yr
|
- | $203 | $1,830 | |
03 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $423 | $13,505 |
$423
5,714
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $12,150 | $81,353 |
$6,965
88,032
kWh
|
$1,190
-
kW-mo/yr
|
$1,962
-
MMBtu
|
$203 | $1,830 | ||
TOTAL IMPLEMENTED | $9,765 | $65,592 |
$6,542
82,318
kWh
|
$1,190
-
kW-mo/yr
|
- | $203 | $1,830 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs