ITAC Assessment: SD0596
ITAC logo
ITAC Assessment: SD0596
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Server Cabinets
NAICS 332321: Metal Window and Door Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 86
Plant Area 58,000
ft2
Annual Production 21,000
units
Production Hrs. Annual 4,335
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,033 815,130
kWh
Electricity Demand $33,030 2,804
kW-mo/yr
Electricity Fees $2,889 -
Natural Gas $71,939 10,235
MMBtu
TOTAL YEARLY COSTS $206,891
RECOMMENDED SAVINGS* $20,185 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,809 $30,150 $8,052
66,278
kWh
$3,757
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,628 $300 $3,201
26,331
kWh
$427
-
kW-mo/yr
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $3,037 $2,560 $3,037
24,999
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,711 - $1,711
14,092
kWh
-
TOTAL RECOMMENDED $20,185 $33,010 $16,001
131,700
kWh
$4,184
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs