ITAC Assessment: IP0048
ITAC logo
ITAC Assessment: IP0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Bread, Rolls, Muffins
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 151,000
ft2
Annual Production 136,407,598
lb
Production Hrs. Annual 7,440
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $589,123 13,780,576
kWh
Electricity Demand $232,687 29,162
kW-mo/yr
Electricity Fees $102,951 -
Natural Gas $695,377 133,644
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,715 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,171

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.8112: Combine utility meters $27,805 $21 - - $27,805 - -
02 2.2621: Modify refrigeration system to operate at a lower pressure $16,379 $5 $9,803
508,732
kWh
$6,576
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,718 $5 $4,718
244,856
kWh
- - - -
04 2.4322: Use or replace with energy efficient substitutes $902 $45 $902
46,800
kWh
- - - -
05 2.7221: Lower temperature during the winter season and vice-versa $2,880 $430 $576
29,872
kWh
- - $2,304
-
MMBtu
-
06 2.7229: Air condition only space necessary $394 $193 $394
20,442
kWh
- - - -
07 4.812: Apply for investment incentives $8,854 $4,500 - - - - $8,854
08 4.812: Apply for investment incentives $15,491 $9,000 - - - - $15,491
09 2.7142: Utilize higher efficiency lamps and/or ballasts $5,176 $8,753 $3,100
160,853
kWh
$2,076
-
kW-mo/yr
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $116 $413 $110
5,729
kWh
$6
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $82,715 $23,365 $19,603
1,017,284
kWh
$8,658
-
kW-mo/yr
$27,805 $2,304
-
MMBtu
$24,345
TOTAL IMPLEMENTED $30,171 $9,651 $19,209
996,842
kWh
$8,658
-
kW-mo/yr
- $2,304
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs