Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

77

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Administrative and support services
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1142 #07 Y:2026 Install vinyl strip / high speed / air curtain doors $2,469 $8,240
UD1142 #06 Y:2026 Install occupancy sensors $1,317 $2,481
UD1142 #05 Y:2026 Disconnect ballasts $14,992 $20,812
UD1142 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $382 $953
UD1142 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $1,190 -
UD1142 #02 Y:2026 Eliminate or reduce compressed air usage $2,261 $32
UD1142 #01 Y:2026 Utilize energy-efficient belts and other improved mechanisms $469 -
GT1010 #07 Y:2026 Use solar heat to make electricty $49,377 $1,123,789
GT1010 #06 Y:2026 Replace existing hvac unit with high efficiency model $33,339 $501,250
GT1010 #05 Y:2026 Replace fossil fuel equipment with electrical equipment $8,013 $91,000
GT1010 #04 Y:2026 Install occupancy sensors $5,485 $19,955
GT1010 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $6,809 $15,278
GT1010 #02 Y:2026 Reduce space conditioning during non-working hours $11,999 $5,850
GT1010 #01 Y:2026 Pay bills on time to avoid late fees $6,059 $50
MZ1023 #09 Y:2026 Use steam sparging or injections in place of indirect heating $163,794 $190,000
MZ1023 #08 Y:2026 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $81,881 $665,000
MZ1023 #07 Y:2026 Utilize controls to operate equipment only when needed $1,311 $2,140
MZ1023 #06 Y:2026 Insulate bare equipment $31,375 $16,500
MZ1023 #05 Y:2026 Recover heat from exhausted steam, hot air or hot water $13,206 $54,300
MZ1023 #04 Y:2026 Level zero – install control systems for existing equipment $47,010 $41,600