ITAC Assessment: UD1142
ITAC logo
ITAC Assessment: UD1142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Packaging
NAICS 561910: Packaging and Labeling Services
SIC 7389: Business Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 320
Plant Area 394,000
ft2
Annual Production 6,061,410
units
Production Hrs. Annual 4,160
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,505 2,663,907
kWh
Electricity Demand $66,190 9,499
kW-mo/yr
Electricity Fees $1,144 -
Natural Gas $37,876 3,820
MMBtu
Waste Disposal Costs
Water Usage $6,488 966
Tgal
Water Disposal $3,570 381
Tgal
Other Liquid (non-haz) $2,194 1
gal
TOTAL YEARLY COSTS $309,967
RECOMMENDED SAVINGS* $23,080 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $469 - $367
5,083
kWh
$102
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $2,261 $32 $598
8,276
kWh
$1,663
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,190 - $931
12,874
kWh
$259
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $382 $953 $299
4,138
kWh
$83
-
kW-mo/yr
-
05 2.7122: Disconnect ballasts $14,992 $20,812 $11,731
162,260
kWh
$3,261
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $1,317 $2,481 $628
8,683
kWh
$689
-
kW-mo/yr
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $2,469 $8,240 - - $2,469
-
MMBtu
TOTAL RECOMMENDED $23,080 $32,518 $14,554
201,314
kWh
$6,057
-
kW-mo/yr
$2,469
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs