Assessment Year | 2020 |
---|---|
Principal Product | Precision Machine Components |
NAICS | 332710: Machine Shops |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 42 |
Plant Area |
500,000
ft2
|
Annual Production | 194,673
units
|
Production Hrs. Annual | 4,480
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $51,837 | 1,047,212 |
kWh
|
$0.049 | |
Electricity Demand | $17,773 | 4,860 |
kW-mo/yr
|
$3.66 | |
Electricity Fees | $22,216 | - |
|
- | |
Natural Gas | $20,323 | 3,528 |
MMBtu
|
$5.76 | |
Waste Disposal Costs | |||||
Water Usage | $2,520 | 432 |
Tgal
|
$5.84 | |
Water Disposal | $2,520 | 432 |
Tgal
|
$5.84 | |
TOTAL YEARLY COSTS | $117,188 | ||||
RECOMMENDED SAVINGS* | $24,249 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $18,962 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $85 | - |
$60
1,207
kWh
|
$25
-
kW-mo/yr
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,918 | $1,358 |
$1,577
31,851
kWh
|
$341
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $433 | - |
$308
6,218
kWh
|
$125
-
kW-mo/yr
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $966 | - |
$686
13,867
kWh
|
$280
-
kW-mo/yr
|
- | - | |
05 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $8,764 | $42,000 |
$4,847
97,920
kWh
|
$3,917
-
kW-mo/yr
|
- | - | |
06 | 2.7231: Use radiant heater for spot heating | $2,079 | $7,980 |
$437
8,820
kWh
|
- |
$1,642
-
MMBtu
|
- | |
07 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $772 | $50 |
$673
13,603
kWh
|
$99
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,232 | $18,000 |
$6,883
139,045
kWh
|
$1,362
-
kW-mo/yr
|
- | $987 | |
TOTAL RECOMMENDED | $24,249 | $69,388 |
$15,471
312,531
kWh
|
$6,149
-
kW-mo/yr
|
$1,642
-
MMBtu
|
$987 | ||
TOTAL IMPLEMENTED | $18,962 | $60,000 |
$12,416
250,832
kWh
|
$5,559
-
kW-mo/yr
|
- | $987 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs