ITAC Assessment: UF0160
ITAC logo
ITAC Assessment: UF0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Steel Joists
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 55,400
ft2
Annual Production 13,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,066 1,128,077
kWh
Electricity Demand $23,479 2,580
kW-mo/yr
Fuel Oil #2 $2,621 403
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,568 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,492

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,918 $5,512 $5,450
126,612
kWh
$2,468
-
kW-mo/yr
-
02 2.7145: Install skylights $2,362 $2,560 $2,362
34,291
kWh
- -
03 2.4133: Use most efficient type of electric motors $335 $780 $239
5,569
kWh
$96
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,492 $1,350 $3,492
50,703
kWh
- -
05 2.4239: Eliminate or reduce compressed air usage $9,421 $2,100 $9,421
136,577
kWh
- -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,040 $3,000 - - $1,040
-
lb
TOTAL RECOMMENDED $24,568 $15,302 $20,964
353,752
kWh
$2,564
-
kW-mo/yr
$1,040
-
lb
TOTAL IMPLEMENTED $3,492 $1,350 $3,492
50,703
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs