ITAC Assessment: GT1010
ITAC logo
ITAC Assessment: GT1010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product None
NAICS 561210: Facilities Support Services
SIC 8744: Facilities Support Management Services
Sales Range less than $500
k
# of Employees 300
Plant Area 271,170
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,396 4,375,336
kWh
Electricity Demand $147,306 16,374
kW-mo/yr
Electricity Fees $6,059 -
Fuel Oil #2 $47,456 2,148
MMBtu
TOTAL YEARLY COSTS $403,217
RECOMMENDED SAVINGS* $121,081 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings
01 4.821: Pay bills on time to avoid late fees $6,059 $50 - - $6,059 -
02 2.7224: Reduce space conditioning during non-working hours $11,999 $5,850 $9,461
205,671
kWh
$2,538
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,809 $15,278 $5,370
116,745
kWh
$1,439
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $5,485 $19,955 $4,326
94,050
kWh
$1,159
-
kW-mo/yr
- -
05 2.1321: Replace fossil fuel equipment with electrical equipment $8,013 $91,000 $(-15,456.0)
(-336,000)
kWh
$(-12,096.0)
-
kW-mo/yr
- $35,565
-
MMBtu
06 2.7232: Replace existing hvac unit with high efficiency model $33,339 $501,250 $12,268
266,703
kWh
$3,289
-
kW-mo/yr
- $17,782
-
MMBtu
07 2.9114: Use solar heat to make electricty $49,377 $1,123,789 $39,981
863,811
kWh
$9,396
-
kW-mo/yr
- -
TOTAL RECOMMENDED $121,081 $1,757,172 $55,950
1,210,980
kWh
$5,725
-
kW-mo/yr
$6,059 $53,347
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs