matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LT8443 #04 Y:2026 | 04 | 2026 | Use solar heat to make electricty | $283,539 | $2,113,200 |
n/a
|
| LT8443 #03 Y:2026 | 03 | 2026 | Utilize higher efficiency lamps and/or ballasts | $263 | $713 |
n/a
|
| LT8443 #02 Y:2026 | 02 | 2026 | Use or replace with energy efficient substitutes | $60,922 | $686,315 |
n/a
|
| LT8443 #01 Y:2026 | 01 | 2026 | Reduce the pressure of compressed air to the minimum required | $155 | - |
n/a
|
| IP0181 #04 Y:2023 | 04 | 2023 | Heat treat parts only to required specifications or standards | $1,031 | $6,735 | |
| IP0181 #03 Y:2023 | 03 | 2023 | Reduce space conditioning during non-working hours | $136 | $95 | |
| IP0181 #02 Y:2023 | 02 | 2023 | Eliminate or reduce compressed air usage | $4,823 | $239 | |
| IP0181 #01 Y:2023 | 01 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $465 | $18 | |
| TR0032 #03 Y:2022 | 03 | 2022 | Use solar heat to make electricty | $291,171 | $4,331,813 | |
| TR0032 #02 Y:2022 | 02 | 2022 | Optimize plant power factor | $6,520 | $17,100 | |
| TR0032 #01 Y:2022 | 01 | 2022 | Utilize higher efficiency lamps and/or ballasts | $3,606 | $6,302 | |
| IC0248 #07 Y:2021 | 07 | 2021 | Utilize energy-efficient belts and other improved mechanisms | $1,758 | $258 | |
| IC0248 #06 Y:2021 | 06 | 2021 | Use or replace with energy efficient substitutes | $3,328 | $349 | |
| IC0248 #05 Y:2021 | 05 | 2021 | Utilize daylight whenever possible in lieu of artificial light | $1,297 | - | |
| IC0248 #04 Y:2021 | 04 | 2021 | Remove or close off unneeded compressed air lines | $724 | $712 | |
| IC0248 #03 Y:2021 | 03 | 2021 | Eliminate or reduce compressed air usage | $94,808 | $23,408 | |
| IC0248 #02 Y:2021 | 02 | 2021 | Recharge batteries on during off-peak demand periods | $23,744 | - | |
| IC0248 #01 Y:2021 | 01 | 2021 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,148 | $4,150 | |
| UM0377 #09 Y:2010 | 09 | 2010 | Reprocess spent oils on site for re-use | $626 | $627 | |
| UM0377 #08 Y:2010 | 08 | 2010 | Use heat from boiler blowdown to preheat boiler feed water | $2,554 | $11,607 |