ITAC Assessment: TR0032
ITAC logo
ITAC Assessment: TR0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Ferrous (P&S, HMS, Shr'd), non Ferrous (Zorbu, mix metals)
NAICS 423930: Recyclable Material Merchant Wholesalers
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 219
Plant Area 2,918,520
ft2
Annual Production 57,294
ton
Production Hrs. Annual 2,432
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,430 734,600
kWh
Electricity Demand $67,752 21,072
kW-mo/yr
Electricity Fees $3,831 -
TOTAL YEARLY COSTS $155,013
RECOMMENDED SAVINGS* $301,297 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,606 $6,302 $3,164
27,859
kWh
$442
-
kW-mo/yr
02 2.3212: Optimize plant power factor $6,520 $17,100 - $6,520
-
kW-mo/yr
03 2.9114: Use solar heat to make electricty $291,171 $4,331,813 $291,171
6,409,400
kWh
-
TOTAL RECOMMENDED $301,297 $4,355,215 $294,335
6,437,259
kWh
$6,962
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs