Assessment Year | 2010 |
---|---|
Principal Product | Recycled Oil Products |
NAICS | 423930: Recyclable Material Merchant Wholesalers |
SIC | 5093: Scrap and Waste Materials |
Sales Range | $10 M to 50M |
# of Employees | 25 |
Plant Area |
3,500
ft2
|
Annual Production | 2,500
Tgal
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $44,493 | 1,069,760 |
kWh
|
$0.042 |
Electricity Demand | $64,901 | 3,203 |
kW-mo/yr
|
$20.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $86,597 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $4,826 | $600,000 |
$2,496
60,010
kWh
|
$2,330
-
kW-mo/yr
|
- | - | |
02 | 2.4224: Upgrade controls on compressors | $4,594 | $7,127 |
$4,594
110,448
kWh
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $421 | $200 |
$421
10,134
kWh
|
- | - | - | |
04 | 2.6211: Conserve energy by efficient use of vending machines | $71 | $10 |
$71
1,700
kWh
|
- | - | - | |
05 | 2.2128: Use steam condensate for hot water supply (non-potable) | $47,701 | $4,568 |
$28,797
2,424
kWh
|
- | - |
$18,904
-
Tgal
|
|
06 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $11,037 | $8,500 | - | - |
$11,037
-
MMBtu
|
- | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $14,767 | $700 | - | - |
$14,767
-
MMBtu
|
- | |
08 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $2,554 | $11,607 | - | - |
$2,554
-
MMBtu
|
- | |
09 | 3.5112: Reprocess spent oils on site for re-use | $626 | $627 |
$68
1,652
kWh
|
- |
$558
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $86,597 | $633,339 |
$36,447
186,368
kWh
|
$2,330
-
kW-mo/yr
|
$28,916
-
MMBtu
|
$18,904
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs