ITAC Assessment: IP0181
ITAC logo
ITAC Assessment: IP0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Plastics
NAICS 423930: Recyclable Material Merchant Wholesalers
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $1
M
to 5
M
# of Employees 12
Plant Area 40,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 5,200
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,277 1,058,400
kWh
Electricity Fees $8,061 -
Natural Gas $8,589 921
MMBtu
TOTAL YEARLY COSTS $125,926
RECOMMENDED SAVINGS* $6,455 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $465 $18 $465
4,516
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $4,823 $239 $4,823
46,822
kWh
-
03 2.7224: Reduce space conditioning during non-working hours $136 $95 $36
354
kWh
$100
-
MMBtu
04 2.2311: Heat treat parts only to required specifications or standards $1,031 $6,735 - $1,031
-
MMBtu
TOTAL RECOMMENDED $6,455 $7,087 $5,324
51,692
kWh
$1,131
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs