ITAC Assessment: NC0425
ITAC logo
ITAC Assessment: NC0425
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Cartons for food
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area 128,000
ft2
Annual Production 90,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $255,707 6,890,100
kWh
Electricity Demand $130,597 14,730
kW-mo/yr
Electricity Fees $6,127 -
Natural Gas $24,069 2,110
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,845 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,591

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $14,162 $5,000 $10,405
280,376
kWh
$3,757
-
kW-mo/yr
- - -
02 2.4151: Develop a repair/replace policy $2,202 $3,750 $1,618
43,587
kWh
$584
-
kW-mo/yr
- - -
03 2.7231: Use radiant heater for spot heating $3,993 $10,500 - - $3,993
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $347 $100 $872
23,499
kWh
$315
-
kW-mo/yr
- $(-600.0) $(-240.0)
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $420 $25 - $420
-
kW-mo/yr
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,542 $25 $1,868
50,343
kWh
$674
-
kW-mo/yr
- - -
07 2.4239: Eliminate or reduce compressed air usage $491 $700 $491
13,238
kWh
- - - -
08 2.7135: Install occupancy sensors $630 $980 $630
16,990
kWh
- - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $3,465 $3,975 $2,544
68,565
kWh
$921
-
kW-mo/yr
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $20,987 $71,380 $18,339
494,172
kWh
$6,622
-
kW-mo/yr
- $(-5,406.0) $1,432
11 2.4239: Eliminate or reduce compressed air usage $2,306 $4,600 $648
17,451
kWh
$1,658
-
kW-mo/yr
- - -
12 4.625: Develop standard operating procedures $6,300 $3,000 - - - $6,300 -
TOTAL RECOMMENDED $57,845 $104,035 $37,415
1,008,221
kWh
$14,951
-
kW-mo/yr
$3,993
-
MMBtu
$294 $1,192
TOTAL IMPLEMENTED $39,591 $81,435 $32,790
883,602
kWh
$11,615
-
kW-mo/yr
- $(-6,006.0) $1,192
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs