ITAC Assessment: MI0211
ITAC logo
ITAC Assessment: MI0211
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Fruit Juice
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 596,557
ft2
Annual Production 80,000
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,321,822 18,938,400
kWh
Electricity Demand $81,251 70,440
kW-mo/yr
Electricity Fees $42,507 -
Natural Gas $182,886 35,683
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,005 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,661

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7425: Clean or color roof to reduce solar load $25,532 $213,119 $22,032
314,743
kWh
$3,500
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,191 $41,400 $24,634
351,921
kWh
$557
-
kW-mo/yr
-
03 2.2414: Use waste heat from hot flue gases to preheat $24,390 $25,000 - - $24,390
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $22,111 $1,320 $21,508
307,258
kWh
$603
-
kW-mo/yr
-
05 2.2447: Heat water with exhaust heat $16,479 $30,000 - - $16,479
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $5,771 $1,950 - - $5,771
-
MMBtu
07 2.4231: Reduce the pressure of compressed air to the minimum required $3,618 $50 $3,438
49,113
kWh
$180
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,475 $1,720 $1,443
20,617
kWh
$32
-
kW-mo/yr
-
09 2.4323: Use optimum size and capacity equipment $1,438 $4,571 $1,408
20,111
kWh
$30
-
kW-mo/yr
-
TOTAL RECOMMENDED $126,005 $319,130 $74,463
1,063,763
kWh
$4,902
-
kW-mo/yr
$46,640
-
MMBtu
TOTAL IMPLEMENTED $83,661 $262,410 $73,020
1,043,146
kWh
$4,870
-
kW-mo/yr
$5,771
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs