ITAC Assessment: AS0358
ITAC logo
ITAC Assessment: AS0358
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Corrugated Boxes
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 117,000
ft2
Annual Production 120,000
thousand feet
Production Hrs. Annual 4,224
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,572 1,009,440
kWh
Electricity Demand $6,945 2,932
kW-mo/yr
Electricity Fees $5,313 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $115,824 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,843

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $383 $1,819 $228
5,317
kWh
$155
-
kW-mo/yr
- - -
02 2.7111: Reduce illumination to minimum necessary levels $3,694 $310 $2,127
53,179
kWh
$1,567
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $88 $200 $88
2,201
kWh
- - - -
04 2.7144: Install spectral reflectors / delamp $221 $32 $142
3,538
kWh
$79
-
kW-mo/yr
- - -
05 2.7232: Replace existing hvac unit with high efficiency model $1,266 $4,000 $923
23,082
kWh
$343
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,918 $140 $5,454
136,352
kWh
$4,464
-
kW-mo/yr
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,222 $3,084 $3,410
85,255
kWh
$812
-
kW-mo/yr
- - -
08 2.6218: Turn off equipment when not in use $413 $862 $385
9,631
kWh
- $28 - -
09 2.4133: Use most efficient type of electric motors $2,109 $865 $2,046
51,134
kWh
$63
-
kW-mo/yr
- - -
10 4.445: Install equipment to move product $59,136 $4,060 - - - $59,136 -
11 4.521: Clear and rent existing space $34,374 $12,148 n/a - - - - $34,374
TOTAL RECOMMENDED $115,824 $27,520 $14,803
369,689
kWh
$7,483
-
kW-mo/yr
$28 $59,136 $34,374
TOTAL IMPLEMENTED $21,843 $9,293 $14,487
362,171
kWh
$7,328
-
kW-mo/yr
$28 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs