56
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0340 #01 Y:2012 | 01 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $9,181 | $8,250 | |
| OK0818 #09 Y:2011 | 09 | 2011 | Install wind powered electric generator | $17,200 | $168,000 | |
| OK0818 #08 Y:2011 | 08 | 2011 | Reduce the pressure of compressed air to the minimum required | $482 | $2,104 | |
| OK0818 #07 Y:2011 | 07 | 2011 | Install compressor air intakes in coolest locations | $535 | $386 | |
| OK0818 #06 Y:2011 | 06 | 2011 | Recover waste heat from equipment | $1,355 | $4,015 | |
| OK0818 #05 Y:2011 | 05 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,726 | $1,635 | |
| OK0818 #04 Y:2011 | 04 | 2011 | Install occupancy sensors | $309 | $2,707 | |
| OK0818 #03 Y:2011 | 03 | 2011 | Utilize higher efficiency lamps and/or ballasts | $4,786 | $40,503 | |
| OK0818 #02 Y:2011 | 02 | 2011 | Utilize higher efficiency lamps and/or ballasts | $2,735 | $29,626 | |
| OK0818 #01 Y:2011 | 01 | 2011 | Use radiant heater for spot heating | $8,413 | $91,000 | |
| UA0011 #08 Y:2007 | 08 | 2007 | Install occupancy sensors | $364 | $346 | |
| UA0011 #07 Y:2007 | 07 | 2007 | Chill water to the highest temperature possible | $1,174 | - | |
| UA0011 #06 Y:2007 | 06 | 2007 | Recover waste heat from equipment | $2,493 | $2,877 | |
| UA0011 #05 Y:2007 | 05 | 2007 | Reduce the pressure of compressed air to the minimum required | $3,753 | - | |
| UA0011 #04 Y:2007 | 04 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,894 | $700 | |
| UA0011 #03 Y:2007 | 03 | 2007 | Keep doors and windows shut when not on use | $11,081 | - | |
| UA0011 #02 Y:2007 | 02 | 2007 | Utilize higher efficiency lamps and/or ballasts | $45,713 | $91,928 | |
| UA0011 #01 Y:2007 | 01 | 2007 | Utilize higher efficiency lamps and/or ballasts | $67,624 | $122,055 | |
| IC0131 #18 Y:2007 | 18 | 2007 | Modify current incentive program | $19,189 | $38,378 | |
| IC0131 #17 Y:2007 | 17 | 2007 | Change procedures / equipment / operating conditions | $5,723 | $15,000 |