ITAC Assessment: UA0011
ITAC logo
ITAC Assessment: UA0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Automotive seating and interiors
NAICS 423120: Motor Vehicle Supplies and New Parts Merchant Wholesalers
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range less than $500
k
# of Employees 589
Plant Area 360,000
ft2
Annual Production 170,000
units
Production Hrs. Annual 4,335
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $538,743 11,539,200
kWh
Electricity Demand $131,118 27,319
kW-mo/yr
Natural Gas $50,890 2,883
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $138,096 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $84,599

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $67,624 $122,055 $61,051
942,870
kWh
$6,573
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $45,713 $91,928 $39,577
611,227
kWh
$6,136
-
kW-mo/yr
-
03 2.7442: Keep doors and windows shut when not on use $11,081 - $2,046
150,918
kWh
- $9,035
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,894 $700 $5,894
90,954
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,753 - $3,753
57,965
kWh
- -
06 2.2437: Recover waste heat from equipment $2,493 $2,877 - - $2,493
-
MMBtu
07 2.2625: Chill water to the highest temperature possible $1,174 - $882
14,755
kWh
$292
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $364 $346 $364
5,228
kWh
- -
TOTAL RECOMMENDED $138,096 $217,906 $113,567
1,873,917
kWh
$13,001
-
kW-mo/yr
$11,528
-
MMBtu
TOTAL IMPLEMENTED $84,599 $122,755 $68,991
1,184,742
kWh
$6,573
-
kW-mo/yr
$9,035
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs