matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0808 #05 Y:2025 | 05 | 2025 | Reduce the pressure of compressed air to the minimum required | $4,146 | $30,877 |
n/a
|
| OR0808 #04 Y:2025 | 04 | 2025 | Reduce illumination to minimum necessary levels | $3,076 | - |
n/a
|
| OR0808 #03 Y:2025 | 03 | 2025 | Reduce ventilation air | $6,836 | - |
n/a
|
| OR0808 #02 Y:2025 | 02 | 2025 | Use cooling tower or economizer to replace chiller cooling | $8,055 | - |
n/a
|
| OR0808 #01 Y:2025 | 01 | 2025 | Reduce ventilation air | $13,430 | - |
n/a
|
| SD0671 #06 Y:2025 | 06 | 2025 | Reduce space conditioning during non-working hours | $1,404 | - |
n/a
|
| SD0671 #05 Y:2025 | 05 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $6,033 | $9,226 |
n/a
|
| SD0671 #04 Y:2025 | 04 | 2025 | Replace fossil fuel equipment with electrical equipment | $14,911 | $23,188 |
n/a
|
| SD0671 #03 Y:2025 | 03 | 2025 | Recharge batteries on during off-peak demand periods | $3,996 | - |
n/a
|
| SD0671 #02 Y:2025 | 02 | 2025 | Use battery storage for demand control | $2,541 | $1,352 |
n/a
|
| SD0671 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $72,797 | $103,994 |
n/a
|
| LT8397 #04 Y:2024 | 04 | 2024 | Install occupancy sensors | $158 | $63 |
n/a
|
| LT8397 #03 Y:2024 | 03 | 2024 | Turn off equipment when not in use | $1,111 | $888 |
n/a
|
| LT8397 #02 Y:2024 | 02 | 2024 | Utilize higher efficiency lamps and/or ballasts | $416 | $2,298 |
n/a
|
| LT8397 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $17,937 | $4,003 |
n/a
|
| NT0025 #06 Y:2024 | 06 | 2024 | Change operating conditions | $150,000 | $1,200,000 | |
| NT0025 #05 Y:2024 | 05 | 2024 | Optimize plant power factor | $2,643 | $1,302 | |
| NT0025 #04 Y:2024 | 04 | 2024 | Install equipment (eg compactor) to reduce disposal costs | $36,410 | $21,995 | |
| NT0025 #03 Y:2024 | 03 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $6,511 | $906 | |
| NT0025 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,914 | $5,609 |