Assessment Year | 2024 |
---|---|
Principal Product | Custom stone kitchen & bath products |
NAICS | 423320: Brick, Stone, and Related Construction Material Merchant Wholesalers |
SIC | 5032: Brick, Stone, and Related Construction Materials |
Sales Range | $1 M to 5M |
# of Employees | 87 |
Plant Area |
100,000
ft2
|
Annual Production | 7,000
units
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $58,698 | 757,800 |
kWh
|
$0.077 | |
Electricity Demand | $9,282 | 2,376 |
kW-mo/yr
|
$3.91 | |
Electricity Fees | $13,607 | - |
|
- | |
Natural Gas | $8,225 | 680 |
MMBtu
|
$12.10 | |
Fuel Oil #2 | $439,715 | 16,119 |
MMBtu
|
$27.28 | |
Waste Disposal Costs | |||||
Water Usage | $6,889 | 422 |
Tgal
|
$16.32 | |
TOTAL YEARLY COSTS | $536,416 | ||||
RECOMMENDED SAVINGS* | $31,171 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $474 | $100 |
$396
5,148
kWh
|
$78
-
kW-mo/yr
|
- | |
02 | 2.7261: Install timers and/or thermostats | $2,648 | $960 |
$2,624
34,075
kWh
|
- |
$24
-
MMBtu
|
|
03 | 2.7135: Install occupancy sensors | $307 | $140 |
$307
3,991
kWh
|
- | - | |
04 | 2.2443: Re-use or recycle hot or cold process exhaust air | $5,106 | $2,500 | - | - |
$5,106
-
MMBtu
|
|
05 | 2.7232: Replace existing hvac unit with high efficiency model | $14,800 | $19,440 | - | - |
$14,800
-
MMBtu
|
|
06 | 2.7232: Replace existing hvac unit with high efficiency model | $6,361 | $21,000 |
$6,189
80,371
kWh
|
$172
-
kW-mo/yr
|
- | |
07 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $1,253 | $9,000 |
$(-358.0)
(-4,653)
kWh
|
$(-35.0)
-
kW-mo/yr
|
$1,646
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $222 | $1,600 |
$179
2,330
kWh
|
$43
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $31,171 | $54,740 |
$9,337
121,262
kWh
|
$258
-
kW-mo/yr
|
$21,576
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs